2014年1月9日星期四

Talking about the proper use of heating cable

Notes 1 ) heating cable installed thermal power cord factory , not on the ground to avoid damage by sharp objects . Do not touch the hot objects to prevent welding slag splashing into heating cable .
 2 ) heating cable power cord plant has very good flexibility, but can not be folded , you need to bend , bend heating cable thickness not less than 6 times the radius .
 3 ) heating cable power cord plant RAC CABLE  in Shenyang prohibited by heavy blow, because the North miscellaneous electrical heating cable should be re- passing the test , you can use .
 4 ) heating cable should be accompanied by heat pipes ( or device ) and fixed tightly to improve heating efficiency . Special nylon cable ties fixed heating use , prohibit the use of combined power cord factory wire .
 5 ) non-metallic pipe shall be affixed between the aluminum wall and floor heating cables , used to increase the heat transfer area .
 6 ) when the heating cable installation should consider charging cord factory of pipe fittings ( or device ) and the possibility of removal , heating cables do not need to cut . Note that the cable is cut or joint sealing joints .
7 ) per meter pipe heat loss is greater than the total heating cable power cord factory output power , heating cable laying , in order to facilitate disassembly and maintenance .
 8 ) flange leakage , wound heating cable should be avoided below it.
 9 ) heating cable ducts fixed power cord factory installed safety methods. With the temperature of the material should be selected based on the pipeline .
 10 ) Install the heating system must  HDMI CABLE be individually qualified electrical test loop plant power cord , and then test to check the heating cable heating conditions . Claim normal , the insulation .
 11 ) insulation material should be dry . Wet insulation material not only affects the heating effect, but also heating cable corrosion leads to shortened life, does not include the power cable factory pipe insulation protection layer , snow is wet , it should be dry after construction of the outer protective layer.
 After the construction of 12 ) heating system should be in the outer protective layer of the pipe , electric heating obvious signs to draw attention .
 13 ) When installing heating cables, bus cables and power connections should seal the other end of a match , the two buses should be shorted .
 14 ) Multi- loop heating cable to connect the power cable factory in the same junction box, the car must have insulated isolation to prevent short circuits.
 15 ) junction box should be sealed to prevent water from entering .

没有评论:

发表评论